Saturday, 15 Aug 2026
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA
logo logo
  • World
  • Politics
  • Crime
  • Economy
  • Tech & Science
  • Sports
  • Entertainment
  • More
    • Education
    • Celebrities
    • Culture and Arts
    • Environment
    • Health and Wellness
    • Lifestyle
  • 🔥
  • Trump
  • House
  • White
  • ScienceAlert
  • VIDEO
  • man
  • Trumps
  • Season
  • star
  • Years
Font ResizerAa
American FocusAmerican Focus
Search
  • World
  • Politics
  • Crime
  • Economy
  • Tech & Science
  • Sports
  • Entertainment
  • More
    • Education
    • Celebrities
    • Culture and Arts
    • Environment
    • Health and Wellness
    • Lifestyle
Follow US
© 2024 americanfocus.online – All Rights Reserved.
American Focus > Blog > The White House > Authorizing Enbridge Pipelines (Southern Lights) L.L.C. to Operate and Maintain Existing Pipeline Facilities at Pembina County, North Dakota, at the International Boundary Between the United States and Canada – The White House
The White House

Authorizing Enbridge Pipelines (Southern Lights) L.L.C. to Operate and Maintain Existing Pipeline Facilities at Pembina County, North Dakota, at the International Boundary Between the United States and Canada – The White House

Last updated: April 15, 2026 6:50 pm
Share
Authorizing Enbridge Pipelines (Southern Lights) L.L.C. to Operate and Maintain Existing Pipeline Facilities at Pembina County, North Dakota, at the International Boundary Between the United States and Canada – The White House
SHARE

Under the authority granted to me as President of the United States, I issue this Presidential permit to Enbridge Pipelines (Southern Lights) L.L.C., hereinafter referred to as the “permittee.” The permittee, a limited liability company based in Delaware and a subsidiary of Canada’s Enbridge Inc., is authorized to operate and maintain existing pipeline border facilities at the U.S.-Canada border in Neche, Pembina County, North Dakota. These facilities will be used for the transport of various crude oil and petroleum products, excluding natural gas regulated under section 3 of the Natural Gas Act (15 U.S.C. 717b).

This permit replaces and nullifies the previously issued Presidential permit dated June 10, 2008.

The permit remains subject to all applicable laws and regulations, as outlined in Article 2, ensuring the border facilities comply with federal, state, and local standards.

The term “Facilities” refers to the U.S. portion of the international pipeline project tied to the permittee’s application for an amendment dated January 16, 2026, along with any related land, structures, installations, or equipment.

“Border facilities” are defined as the parts of the Facilities comprising a 20-inch diameter pipeline from the U.S.-Canada border at Neche, extending to the first mainline shut-off valve or pumping station about 3 miles into the U.S., including related land and equipment.

The permit is subject to these conditions:

Article 1. The described border facilities and their operations must adhere to all permit conditions and any future amendments. Significant changes to these facilities or their operation require Presidential approval, except for changes in throughput capacity or directional flow of products.

See also  Adjusting Imports of Timber, Lumber, and their Derivative Products into the United States

Article 2. The operation and maintenance of the border facilities will be open to inspection by authorized federal, state, and local representatives. The permittee must provide free access and comply with all applicable laws and safety regulations, obtaining necessary permits from relevant authorities.

Article 3. If the permit is terminated, revoked, or surrendered, the permittee must remove the border facilities at its own cost within a timeframe specified by the President. Failure to do so allows the President to authorize removal at the permittee’s expense, with no claims for damages allowed.

Article 4. For national security, the President may take control of the border facilities if deemed necessary, with prior notice to the permittee. The U.S. will compensate the permittee fairly and bear restoration costs, minus the value of improvements.

Article 5. Any change in ownership or control of the border facilities, or changes to the permittee’s name, must be reported in writing to the President or his designee. The permit remains in effect under its conditions unless altered by the President.

Article 6. (1) The permittee must acquire any required right-of-way grants, easements, permits, and authorizations.

(2) The permittee indemnifies the U.S. against liabilities from the operation or maintenance of the border facilities, including environmental contamination.

(3) The permittee must ensure the facilities remain in good repair and compliance with applicable laws.

Article 7. The permittee must submit required sworn statements or reports regarding the border facilities to the President or relevant agencies as required by law. This does not alter the permit’s status as a directive from the President.

See also  Trump Administration’s Tomato Tariffs Already a Game Changer for American Farmers – The White House

Article 8. Upon request, the permittee must provide relevant information to the President or his designee about the border facilities, including changes in ownership, control, operation, or maintenance.

Article 9. This permit does not create any enforceable right or benefit against the United States or its entities by any party.

IN WITNESS WHEREOF, I have set my hand this fifteenth day of April, 2026, marking the 250th year of U.S. independence.

DONALD J. TRUMP

TAGGED:AuthorizingboundaryCanadaCountyDakotaEnbridgeexistingFacilitiesHouseInternationalL.L.CLightsMaintainNorthoperatePembinaPipelinepipelinesSouthernstatesUnitedWhite
Share This Article
Twitter Email Copy Link Print
Previous Article DOJ, Biden, AI chest scans, tetanus shot: Morning Rounds DOJ, Biden, AI chest scans, tetanus shot: Morning Rounds
Next Article Major gold holder launches self-custody wallet Major gold holder launches self-custody wallet

Popular Posts

Donna Kelce Says She Doesn’t Have to Sign NDA for Travis & Taylor Swift Wedding

Donna Kelce, mother of NFL star Travis Kelce, recently made headlines for her refusal to…

February 11, 2026

Melissa Gilbert Spoke On Child Abuse Before Tim Busfield’s Arrest

Melissa Gilbert Reflects on Child Abuse in Hollywood Actress Melissa Gilbert recently shared a poignant…

January 11, 2026

John Malone’s Liberty Broadband Loses Board Seats

John Malone, known as the "cable cowboy," has been a significant figure in the cable…

May 16, 2025

FBI Agents Return To Question Nancy Guthrie’s Neighbors

FBI Agents Return to Question Neighbors in Nancy Guthrie's Disappearance Nancy Guthrie has been missing…

March 6, 2026

Retired math teacher, 75, stabbed to death by ‘mentally ill’ tenant inside NYC apartment: neighbor

A tragic incident unfolded in Queens when a 75-year-old retired teacher, George Dournadounas, was found…

March 3, 2026

You Might Also Like

Jennifer Garner’s Flattering White Jeans Style Is on Amazon
Entertainment

Jennifer Garner’s Flattering White Jeans Style Is on Amazon

August 15, 2026
NHL fans react as Hockey Night in Canada Punjabi Edition  gets cancelled after 18 years
Sports

NHL fans react as Hockey Night in Canada Punjabi Edition  gets cancelled after 18 years

August 15, 2026

Presidential Message on the Anniversary of the Social Security Act – The White House

August 14, 2026

Presidential Message on the Anniversary of Winning World War II – The White House

August 14, 2026
logo logo
Facebook Twitter Youtube

About US


Explore global affairs, political insights, and linguistic origins. Stay informed with our comprehensive coverage of world news, politics, and Lifestyle.

Top Categories
  • Crime
  • Environment
  • Sports
  • Tech and Science
Usefull Links
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • DMCA

© 2024 americanfocus.online –  All Rights Reserved.

Welcome Back!

Sign in to your account

Lost your password?